Products /
FarmBot Genesis v1.8
FarmBot Genesis v1.8 — standard configuration
Process
Touches 1 kind of shop: assembly. 1 of 4 steps inferred.
Suppliers
Fabrication
Finishing
Assembly
Inspection and test
1. Kit loose partsInferred
49 catalog lines have no assembly; they ship loose in the kit for the customer's final assembly. packing.md ↗
Needs Kitting and packing · Assembly & system integration
Dashed: inferredClick a step for its evidence
Capabilities across the product
91 lines need factory work; 93 are bought finished and left out. Click a column to see which lines share it.
| Injection molding | Cutting to length | Laser cutting +3 | CNC turning | CNC milling | Drilling and tapping | Press brake bending | Polymer extrusion | Thread cutting | Aluminum extrusion | Deburring and finishing | Sandblasting | Anodizing | Laser engraving | Mechanical assembly | Cable harness building | Electromechanical assembly | Kitting and packing | Insert installation | Dimensional inspection | Electrical testing | Functional testing | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Lines | 18 | 11 | 10 | 6 | 6 | 5 | 3 | 2 | 1 | 1 | 17 | 17 | 17 | 2 | 20 | 19 | 12 | 2 | 1 | 50 | 19 | 6 |
FabricationFinishingAssemblyInspection and testHollow: inferred
Where it gets madeDemo factories
Split across 3 · 6 gaps
split across 3 · 1 gap
split across 2
split across 3 · 1 gap
split across 2
split across 3 · 2 gaps
split across 3
split across 2
split across 3
split across 3
Not in an assembly17 madesplit across 3 · 3 gaps
How we got here
Kit and pack. FarmBot ships as a kit. The factory builds the pre-assemblies, kits the rest, and packs to FarmBot's packing pages. Tracks, beams, belts, motors, and loose hardware are assembled by the customer, so they are kitted, not built.
Each step cites its evidence; click it in the lanes above. Each capability maps a step to the factory database's process families.
Still open
- Order quantity and ship date are not in the packet.