FarmBot Genesis v1.8

FarmBot Genesis v1.8 — standard configuration

Rev 1.8
Process

Touches 1 kind of shop: assembly. 1 of 4 steps inferred.

Suppliers
Fabrication
Finishing
Assembly
Inspection and test
1. Kit loose partsInferred
49 catalog lines have no assembly; they ship loose in the kit for the customer's final assembly. packing.md ↗
Needs Kitting and packing · Assembly & system integration
Dashed: inferredClick a step for its evidence
Capabilities across the product

91 lines need factory work; 93 are bought finished and left out. Click a column to see which lines share it.

Injection moldingCutting to lengthLaser cutting +3CNC turningCNC millingDrilling and tappingPress brake bendingPolymer extrusionThread cuttingAluminum extrusionDeburring and finishingSandblastingAnodizingLaser engravingMechanical assemblyCable harness buildingElectromechanical assemblyKitting and packingInsert installationDimensional inspectionElectrical testingFunctional testing
Lines181110665321117171722019122150196
FabricationFinishingAssemblyInspection and testHollow: inferred
Where it gets madeDemo factories
Split across 3 · 6 gaps
split across 3 · 1 gap
split across 2
split across 3 · 1 gap
split across 2
split across 3 · 2 gaps
split across 3
split across 2
split across 3
split across 3
Not in an assembly17 madesplit across 3 · 3 gaps
How we got here

Kit and pack. FarmBot ships as a kit. The factory builds the pre-assemblies, kits the rest, and packs to FarmBot's packing pages. Tracks, beams, belts, motors, and loose hardware are assembled by the customer, so they are kitted, not built.

Each step cites its evidence; click it in the lanes above. Each capability maps a step to the factory database's process families.

Still open
  • Order quantity and ship date are not in the packet.